DEYE INVERTER SET UP

INVERTER example

5KW Deye Inverter

5KW

8 KW Deye Inverter

8KW

12KW Deye inverter

12KW

Model
Voltage
Bulk/Equalised (Vdc)
Float Voltage (Vdc)
Cutoff Voltage (Vdc)
Recommended Charge Amps
Max Discharge Current (A)
S Series
12V
14
14
12
30A
100A
X-100
48V
52.8
52.8
44
30A
100A
X-101
48V
53.8
53.8
44
30A
100A
X-200
36V
41.5
41.5
34
30A
100A
AM-2
48V
53.8
53.8
44
30A
100A
AM-3
48V
53.8
53.8
44
20A
50A
AM-4
24V
29
29
23.8
30A
100A
AM-5
48V
55.2
55.2
47
30A
100A
AM-10
48V
55.2
55.2
47
60A
150A
BLADE
48V
55.2
55.2
47
50A
200A

The below settings are the recommended settings to use for the corresponding Hubble Lithium battery, as seen on the Deye display. Set the Lithium, maximum charge, and maximum discharge setting.

Deye battery settings view

Recommended settings above.

Charge should be set to 0.5C per Hubble battery.

Deye Battery settings view

Recommended settings above.

Shutdown should not be lower than 20% to enhance battery life.

Plug in the Deye CANBus cable into the master Hubble battery CANBus port. 

​

PLEASE SEE FOLLOW DIP SWITCH SETTINGS TABLE BELOW


Link up all your extra batteries as per the manual and set each address accordingly. The Hubble batteries will automatically start communicating with the Deye inverter. This completes the setup.

​If you have a Cloudlink you can continue reading below.

cloudlink & pin layout

PLEASE NOTE: It is not required to have a Cloudlink installed for full integration. Installing a Cloudlink is optional.
​
Straight RJ45 to RJ45 with only two wires - 1500mm. Ensure that the clip is pointed away from you when counting the pins. The Hubble Lithium BMS pinouts are the same as the Cloudlink CAN pinouts.

​

TO ENSURE A SUCCESSFUL CLOUDLINK CONNECTION: 
 

  • Ensure that the Cloudlink model is always compatible, older models need to have the RS485 comms enabled at the factory.

  • On the 5KW inverter make sure Cloudlink firmware version is higher / later than V.4.0.0.

  • Make sure inverter firmware is updated to latest.

Do not use straight CAT5 cables. 

 

deye pin layout cloudlink
Pin
CLOUDLINK-MUL
INV - RS485
CLOUDLINK CAN
INV - CAN
1
N/A
N/A
N/A
N/A
2
N/A
N/A
GND
GND
3
N/A
N/A
N/A
N/A
4
N/A
N/A
CAN-H
CAN-H
5
N/A
N/A
CAN-L
CAN-L
6
N/A
N/A
N/A
N/A
7
RS485 A
RS485 A
N/A
N/A
8
RS485 B
RS485 B
N/A
N/A

HUBBLE DIP SWITCH SETTINGS FOR MULTIPLE BATTERY INSTALLATION

​

​For correct setup and communication each battery needs a unique serial address in order to communicate. If you are only using one battery in your setup, consider this the master battery and ensure you set it to address 1.

am-2

AM-2 DIP switch inverter settings

am-5 & AM-10

AM-5 &10 DIP switch inverter settings

INVERTER SETTINGS

COMMON CLOUDLINK - DEYE SETUP QUERIES

​

  1. The inverter RS485 address not configured.
    Solution: Set the inverter to "slave" and configure address 1 to enable the port.

     

  2. Inverters may have older firmware. It takes more than 2.5 sec to respond to RS485 commands, which then cause timeouts on the bus. 
    Solution: Ensure the firmware is up to date.

     

  3. In some early firmware versions Deye/Cloudlink firmware, not all the data was available via Modbus. This has been rectified in the newer firmware versions.
     

  4. On some inverter hardware versions if you use both CAN bus and RS485 at the same time and use 8 core straight CAT5 then RS485 pin A is short-circuited to GND and comms won’t work.
    Solution: Only use the needed pins or wires on the CAT 5 cable, do not use a straight cable.
    Required pins for CAN bus: 2, 4 and 5 only.
    Required pins for RS485: 7 and 8 only - as illustrated above.

     

  5. Older Cloudlink models need to be checked for hardware compatibility with Technical Support. Incompatible models need to be updated with Support directly.
     

​​

How do you setup multiple batteries?

 

See table above and check your product manual for a more detailed explanation. You will have to set dip switch settings per battery to give them a unique address. You also have to connect the included RJ45 battery link cables into the "Battery Link" port of each battery. Ensure your master battery dip switch 1 is on, 2,3,4 is OFF.  Only the master battery CAN Bus will be enabled. You can then connect the Hubble Cloudlink into the CAN port of the master battery for communications to work.

​

​

Do I have to use the communication battery link cables if i dont want to monitor or have communications?

 

Yes

​

​

deye FAQ