MECER INVERTER SETUP

The Mecer inverters are fully compatible with the Hubble range of batteries. 
The following field guide will assist with the correct battery settings you should use.
For further detailed information ensure you read the manual of the supplied battery regarding setup and installation instructions.

MECER INVERTER

Picture
Picture

MECER SOLAR INVERTER

MECER INSTALLATION WITH
​HUBBLE LITHIUM BATTERY

Picture
Picture

MECER INVERTER & HUBBLE
​PRE-LAUNCH SETUP

Download the corresponding Hubble product manual and check the installation guide and pre-launch checklist.
​

MECER INVERTER SETTINGS

The below settings are the recommended settings to use for the corresponding Hubble Lithium battery.
Setup
Mecer
​Hubble AM-2 
Mecer 24V
​Hubble AM-4
Mecer
X-101 51V
Mecer
​S-120 12V (4 in series)
Battery Charge Amps
(Setting 02)
AM-2: Recommend 40Amp per battery
AM-3: Recommended 20Amp per battery
Recommended 40Amp per battery
Recommend 40Amp per battery
Recommend 40Amp
Battery Type
​(Setting 05)
USE
USE
USE
USE
Voltage point back to Utility
​(Setting 12)
47V
24V
47V
48V
Voltage point back to Battery
(Setting 13)
53V
28V
53V
51V
Bulk Charge
​(Setting 26)
53.6V​
29V
53.6V
57.2V
Float Charge Voltage
(Setting 27)
53.6V
28V
53.6V
56V
Low DC Cut off
​(Setting 29)
44V*
22.5V
44V*
46V
*Note the recommended cutoff is 44V ~ 45V. However, the internal battery cutoff is as low as 40V. Setting the cutoff to 40V will drain the battery to 0%. For extended lifespan we recommend a cutoff of 44V ~ 45V.

FREQUENTLY ASKED MECER QUESTIONS

Q: How do you setup multiple batteries?

​A: Check the manual for a more detailed explanation. You will have to set dip switch settings per battery to give them a unique address. You also have to connect the included RJ45 battery link cables into the "Battery Link" port of each battery. Ensure your master battery dip switch 1 is on, 2,3,4 is OFF.  Only the master battery CAN Bus will be enabled. You can then connect the Hubble Cludlink into the CAN port of the master battery for communications to work.

Q: Do I have to use the communication battery link cables if i dont want to monitor or have communications?

​A: Short answer No. However it is recommended to still connect the battery links and set the correct addresses. This also needs to be done if you want to connect a Hubble Cloudlink.

HUBBLE DIP SWITCH SETTINGS FOR MULTIPLE BATTERY INSTALLATION

Picture
Picture
​For correct setup and communication each battery needs a unique serial address in order to communicate.
If you are only using one battery in your setup, consider this the master battery and ensure you set it to address 1.

CONTACT US

​BECOME A RESELLER

RESELLER LOGIN

Picture

VIEW OUR PRODUCTS

ABOUT HUBBLE-RIOT CLOUDLINK

SUPPORT

Copyright Hubble Lithium (pty) ltd 2020 - 2021
  • Home
  • PRODUCTS
    • Solar Lithium Batteries
    • Golf Cart Lithium Batteries
  • Inverter Guides
    • Axpert
    • Deye
    • GoodWe
    • Growatt
    • Kodak
    • Luxpower
    • Mecer
    • Microcare
    • MLT
    • SUNSYNK
    • Must
    • Phocos
    • Synapse
    • Victron
  • Cloudlink
    • HUBBLE Cloudlink
    • Setup Guide
    • CLOUDLINK PORTAL >
      • PORTAL LOGIN
      • CHANGE LOG
  • About
    • News & Updates
  • Contact
  • Reseller
    • Reseller Registration
    • Reseller Access